Stage One September 2009 Images
Perform textured concrete inside the roundabout at the Hasley Canyon northbound off-ramp, east of Hasley Canyon Bridge.
|
Textured concrete paving inside the roundabout, east of the Hasley Canyon Bridge.
|
Place forms for textured concrete inside the roundabout at Hasley Canyon Road and The Old Road.
|
Complete textured concrete around inside of the roundabout at Hasley Canyon Road and The Old Road.
|
|
|
Complete textured concrete in the center Island, east side of the Hasley Canyon Bridge.
|
Placement of forms for Castaic Creek Bridge concrete back wall bridge retrofit, middle of the Interstate 5 freeway.
|
Install corrugated metal storm drain pipe on the east side of Castaic Creek side slope at Castaic Creek Bridge.
|
Place side slope protection rocks on the east side of Castaic Creek Bridge.
|
Complete installation of corrugated metal storm drain pipe and the Castaic Creek side slope protection.
|
Installation of soldier beam for Castaic Creek Bridge shoring, middle of the Interstate 5 freeway.
|
|
|